Rise and fall method
The rise and fall method is a technique used in surveying to determine the difference in elevation between two points. It is commonly used in design and construction to create accurate site plans.
A levelling instrument such as a dumpy level or a theodolite is set up at one point (the benchmark) and a staff is placed at a point whose elevation is to be determined. The instrument is then sighted on the staff and the vertical distance between the instrument and the staff is measured. This is known as the backsight.
The staff is then moved to the next point and the instrument is sighted on the staff again. The vertical distance between the instrument and the staff is measured once more, and this is known as the foresight.
If the foresight is higher than the backsight, it means that the point being surveyed is higher than the benchmark. The difference between the foresight and the backsight is known as the rise. If the foresight is lower than the backsight, it means that the point being surveyed is lower than the benchmark. The difference between the backsight and the foresight is known as the fall.
The process is repeated for multiple points, with the rise and fall measurements being added and subtracted as appropriate.
[edit] Related articles on Designing Buildings
Featured articles and news
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.
Biomass harvested in cycles of less than ten years.
An interview with the new CIAT President
Usman Yaqub BSc (Hons) PCIAT MFPWS.
Cost benefit model report of building safety regime in Wales
Proposed policy option costs for design and construction stage of the new building safety regime in Wales.
Do you receive our free biweekly newsletter?
If not you can sign up to receive it in your mailbox here.



























Comments
[edit] To make a comment about this article, or to suggest changes, click 'Add a comment' above. Separate your comments from any existing comments by inserting a horizontal line.